My Role:
Executive Creative Producer
Creative Partner
Show Caller / Show Director
Making-Of Film
Studio
We hired the studio with area of 2500 sqm & created all technical drawings then we built it entirely in 14 days.

LED Screens
550 sqm of LED Screens were installed

Lighting System
A full ceiling grid & structure of 1.5 Km of EuroTruss with 600 lighting fixtures & more than 5 Km of LED Strips.


Control Room
Where the main star were watching & commenting on the tele-dialogue before revealing himself.

